Activity Summary Window

From IMSMA Wiki
Revision as of 23:21, 21 September 2013 by Alnaucler (talk | contribs)
Jump to: navigation, search

Activities are classified as:

  • BAC
  • Cancellation report
  • Clearance
  • Completion report
  • EOD Spot task
  • Handover certificate
  • Non-technical survey
  • Post clearance
  • Progress Report
  • Road assessment
  • Road clearance
  • Road verification
  • Stockpile destruction
  • Technical survey
Note.jpg Cancellation Report, Progress Report, Completion Report and Handover Certificate are not a pure Activities i.e. operators are not tasked to conduct them, they are outcome reports of activities.

The Activity Summary window displays the Activity ID, as well as location and country structure information. The window also includes four tabs that display the following data:

  • The Activity tab displays general information, such the status, the planned start and end dates, the associated organisation and teams, and the type of activity.
  • The Area Info tab displays the dimensions and description of the area, and other pertinent information such as the clearance depth, the contamination level, and other terrain features.
  • The Device tab displays a table listing the quantity and technical information about ordnances, the destruction method, the condition of the mines/UXO, and whether the device is anti-lift fitted or booby trapped.
  • The Geospatial tab displays geographical information, such as the coordinates, size, and borders of the area associated with the activity. This information is represented as points and polygons.


Activity Summary Window