Difference between revisions of "Shutdown IMSMA Server"
From IMSMA Wiki
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
It is recommended to shutdown the IMSMA server before a backup is taken or a Staging area is generated. | It is recommended to shutdown the IMSMA server before a backup is taken or a Staging area is generated. | ||
− | This command line may either | + | This command line may either be added to the beginning of |
− | + | # the '''[[Scheduling Backup | IMSMA backup script/bat]]''' file | |
− | + | # the generate '''[[Scheduling the Staging Area creation | Staging area script/bat]]''' file | |
+ | '''OR''' | ||
+ | |||
+ | as a separate script/bat file that is scheduled to be executed before the above scripts. | ||
<pre> | <pre> | ||
Line 9: | Line 12: | ||
</pre> | </pre> | ||
− | It is also possible to '''[[Start-up IMSMA Server | | + | It is also possible to '''[[Start-up IMSMA Server | start-up the IMSMA Server]]''' with a bat-file. |
− | |||
{{NavBox Technical Notes}} | {{NavBox Technical Notes}} | ||
[[Category:NAA]] | [[Category:NAA]] |
Latest revision as of 10:22, 17 October 2017
It is recommended to shutdown the IMSMA server before a backup is taken or a Staging area is generated.
This command line may either be added to the beginning of
- the IMSMA backup script/bat file
- the generate Staging area script/bat file
OR
as a separate script/bat file that is scheduled to be executed before the above scripts.
java -cp "C:\IMSMAng\server\jboss4\bin\shutdown.jar" org.jboss.Shutdown -S
It is also possible to start-up the IMSMA Server with a bat-file.