Line 4: | Line 4: | ||
# the '''[[Scheduling Backup | IMSMA backup script/bat]]''' file | # the '''[[Scheduling Backup | IMSMA backup script/bat]]''' file | ||
# the generate '''[[Scheduling the Staging Area creation | Staging area script/bat]]''' file | # the generate '''[[Scheduling the Staging Area creation | Staging area script/bat]]''' file | ||
− | OR | + | '''OR''' |
+ | |||
as a separate script/bat file that is scheduled to be executed before the above scripts. | as a separate script/bat file that is scheduled to be executed before the above scripts. | ||
Revision as of 10:19, 17 October 2017
It is recommended to shutdown the IMSMA server before a backup is taken or a Staging area is generated.
This command line may either be added to
- the IMSMA backup script/bat file
- the generate Staging area script/bat file
OR
as a separate script/bat file that is scheduled to be executed before the above scripts.
java -cp "C:\IMSMAng\server\jboss4\bin\shutdown.jar" org.jboss.Shutdown -S
It is also possible to start-up the IMSMA Server with a bat-file.