Understanding the IMSMANG information model is a prerequisite for an information manager to adapt the system to their country specific mine action requirements. Some sections will include a list of requirements that can be used by information managers to define and document the information model for a programme.
Data Types
Core Data
In the IMSMANG information model, items are the containers for core data, such as mine action data. An item is an area, activity or event that a programme records information about and stores in IMSMANG. There are six categories of items, which are described in the table below. Each category can be characterised by a type that reflects whether the item is designed to track process or activity information or the object or product of an activity.
Item | Description | Type |
---|---|---|
Land | Information about an area | Object/Product |
Activity | Information about an activity, such as efforts to survey, clear, or reduce the threat of a hazard | Process/Activity |
Accident | Information about an accidental event | Object/Product |
Victim | Information about a person injured or affected by an accident | Object/Product |
Assistance | Information about assistance for a person injured or affected by an accident | Object/Product |
Education activity | Information about an activity designed to inform or educate people, such as about local hazards | Object/Product |
Quality Management (QM) activity | Information about an quality-improvement activity, such as an effort to control and monitor the clearance and/or reduction of land or activities | Object/Product |
Items are entered into IMSMANG by means of a Data Entry Form. Typically, each category of items has its own Data Entry Form template for recording information specific to that category. When entered into IMSMANG, all Data Entry Form items must be assigned to a location, which is tied to the country’s gazetteer, or political or administrative structure. The items can then be traced back to the country structure so that users can easily report data such as the number and size of hazardous areas within a particular province.
Item | Category Examples |
---|---|
Land |
|
Activity |
|
Accident |
|
Part of defining and documenting an information model includes defining the useful information attributes for each IMSMANG item. IMSMANG comes with more than 1,000 data elements already defined as well as the capability to create additional custom-defined fields (CDFs). This makes it important to critically assess which data elements are useful to a programme for decision-making, analysis and reporting and to focus on those while ignoring data elements that don’t provide additional value. Limiting information to only that which is useful to the programme provides long-term benefits including reducing the data collection and data entry burden and improving system performance. And, while many data elements may be collected for each IMSMANG item, some elements may be more important for analysis than others. For example, whether a victim has been injured or killed may be more important for analysis than the victim’s nationality.
Each of the items can be divided into categories or types so users can collect information for each category/type. For example, Land are normally divided into different categories/types and each category of land are managed differently. Using categories/types, information managers can:
- create separate workflows for each category/type of Land
- create and manage separate Data Entry Form templates per category/type
- differentiate between item categories/types on the map
Additionally, information managers can customise the categories so that unused categories can be inactivated and other categories added. The same is true for all top-level items within IMSMANG, which lets information managers specify their exact information model, including the relationships among item categories, and adjust the model as their needs change over time. To accurately map the information model for a Mine Action Programme, it’s helpful to evaluate the available item categories and determine if changes to the information model in IMSMANG are required. While these values can be customised after system setup, understanding the types of information for each item is critical to implementing an effective workflow in IMSMANG.
Example of documentation
Auxiliary Data
In addition to defining the required information for IMSMANG items, it is important to define the relevant information to be collected about Auxiliary data. This includes defining and documenting the Country Structure, Explosive Ordnance, Organisation and Place, such as military bases, hospitals and cultural sites; any additional CDFs that should be created; and any subcategories for each of the Auxiliary data types.
In version 6.0 two classifications used for Victim; Cause and Needs assessment, and Assistance classification used for Assistance. All three are hierarchy tree-structures. |
Example of Documented Auxiliary Data
Data Entry Forms and Summaries
A Data Entry Form is a template used for data entry and storage of information e.g. about a victim.
The Data Entry Forms for a specific victim are summarised and displayed in a Summary.
Reconciliation is the process of assigning the information in a Data Entry Form to an existing item or creating a new item/Summary.
Or with other words, all information is entered into IMSMANG via a Data Entry Form. When a Data Entry Form is completed, it is either reconciled to an existing item (that is, it is determined to be information about an item that already exists in IMSMANG) or it is reconciled as new (that is, it is determined to be information about an item that does not already exist in IMSMANG).
With this approach, users can collect and store multiple Data Entry Forms about the same item over time so that the entire history of the item is preserved in the system. The approach also provides a complete audit trail of all changes made to any information so that information managers can answer the question, "What did we know and when did we know it?"
As subsequent information is collected about a specific attribute of an item, IMSMANG updates the item’s Summary on an attribute-by-attribute basis. For example, Data Entry Form #1 collects some initial information about a Land. It sets the priority to "Medium" and specifies that the land contains AP mines and is 25,000 sqm. Data Entry Form #2 updates information about the land area after a subsequent assessment. The report sets the priority to "High" and specifies the presence of AP and AT mines, but it does not change the size or the status of the land area. Data Entry Form #3 updates the land area's size and status after clearance operations are complete. The figure below shows how the land area's Summary is updated after all three reports are entered into the system.
Example of Updating Summaries
Summary calculations are based on the Date of Information/Date of Report on the Data Entry Form, so it is possible to enter data into the system out of chronological order (that is, to collect past information about an item) without disrupting the Summary. For example, if a fourth Data Entry Form were collected and dated between Data Entry Form #1 and Data Entry Form #2, it would have no effect on the Summary as all information in the example was updated with Data Entry Form #2 or later.
Inserting a Data Entry Form in a chain of updates must be done carefully so the expected end-result will be archived |
Location Folder
A location in IMSMANG is a grouping of information, whether logical, geographical or sociopolitical and may be seen as a worksite. Using locations, users can group data that belongs together or is associated with each other and handle it as a group, including facilitating data entry, searching and running reports. To do this, locations must link the data to the country’s political or administrative structure (existing gazetteer), whether at the province, district or town level. This method also provides geographical context to the data. As shown in the figure below, locations in IMSMANG are governed by two simple rules:
- all data must be linked to a location
- all locations must be linked to the country structure
Using Locations to Link Mine Action Data to the Country Structure
Two fundamental decisions to make when customising IMSMANG is to decide what country structure level locations will be consistently linked to and what concept locations will represent. Typical concepts that a location is used to represent include:
- a work area (where activities are taking place)
- a community (a group of people affected by the mine/UXO threat)
- the nearest town (the town closest to where the activity is taking place)
Assigning and Linking
Assigning refers to the assignment of an item to a location for the purposes of grouping information. All items must be assigned a location.
Linking refers to the association between items for the purposes of analysis. Linking is optional, for example, when linking clearances to minefields.
IMSMANG provides the capability to assign items to locations and create links between items, a function that shows the relationships between items and processes and that enriches the data collected. Assignments and links are defined during the Data Entry Form approval process. An item is assigned to one location, which ties the item to the country structure and allows for reporting data by area. The same item can then be linked to as many other items as necessary. In this way, IMSMANG supports the idea of linking activities to land, victims to accidents or any item to any other item. When used with item categories, linking adds a powerful capacity to implement an information workflow and create rich and useful data for decision makers. To ensure the integrity of this data, system administrators must clearly specify the kinds of links to track in IMSMANG.
The example below shows how users can build a workflow of relationships among items to model the information management process for their Mine Action Programmes. The figure shows how the Summary changes with each activity that is linked to the original Land.
- The Land starts its life-cycle as SHA with a status of Open in this example.
- When the technical survey is linked to the Land, the Land classification should be updated to CHA and the status to Worked On.
- Finally, after linking the Completion Report the land's status should be updated to Closed.
The result is one Land whose information is updated over time by the three Activities linked to the land. This way to track information can be used to represent the information management process and status rules accurately for a Land Release, Risk management or other process model.
Example of How Summary Statuses Change
The IMSMANG information model is flexible enough for each Mine Action Programme to customise the system to support its needs. For example, implementations that do not cover Education activities do not need to complete information about Education activities, and they still retain full utility of the system. Similarly, implementations that only cover Victim tracking and Education activities only can disregard Land and Activities without any loss of utility.
Although any item can be linked to any other item, not all relationships necessarily make sense for every implementation. The diagrams below describe some of the more common logical relationships among items and can serve as the basis for an information model when implementing IMSMANG.
Note: Connections to Country Structure and Location have been omitted from the example
The rationale for each relationship or link should also be documented so the meaning is understood. These relationships are used when entering data to ensure that the links between items are available for searching and reporting, like when searching for all Land that have Accidents linked to them.
The Workbench
The Workbench is a holding area / import inbox where Data Entry Forms are found until they are approved. There are three possible steps in the reconciliation process:
- Save
- Submit
- Approve
For data quality purposes, it is important that the data is adequately checked. With multiple permission levels for the Reconciliation, different users can be assigned different permissions, allowing Mine Action Programmes to implement a data-entry workflow that distinguishes between data entry and data verification roles.
Until a Data Entry Form is approved, it exists only in the Workbench and does not update any Summaries. The report can still be modified or deleted. When a Data Entry Form is approved, it becomes part of the Summaries and will be visible on the map.
Adding Data Entry Form Information to the Summary
|