Difference between revisions of "Reconcile started from Data Entry Menu"
Line 69: | Line 69: | ||
==== Examples of end result ====__NOEDITSECTION__ | ==== Examples of end result ====__NOEDITSECTION__ | ||
− | If | + | If the existing item has 15 Unknown AP mines and the Data Entry form has 3 Unknown AP mines the end result with the action Replace is 3 Unknown AP mines. |
If the existing item has one reference point and one polygon and the Data Entry form has only one benchmark the end result with the action Replace is only one benchmark. | If the existing item has one reference point and one polygon and the Data Entry form has only one benchmark the end result with the action Replace is only one benchmark. |
Revision as of 17:12, 9 March 2015
Overview
Data Entry
When data entry is started from either the Data Entry menu or from the Add Data Entry Forms button in the toolbar the possible Actions on the Reconciliation tab are different than when data entry is started from the Summary window.
Reconciliation Tab
When you click the button, you will be given three different options.
Reconciliation Options
- Reconcile as New – allows you to assign the item record to a Location.
- Reconcile as Existing Item – allows you to update an existing item with the information in this Data Entry Form.
- There are two different methods:
- Replace
- Combine.
- Link to Existing Item - allows you to link the item to an existing object of any type.
Item are not normally Linked to Locations. Items are assigned to Locations. |
The difference between Replace and combine
These fields/subobjects are calculated differently depending on if Replace or Combine are chosen as action:
Data | Item |
Area size | Activty, Land |
Cause / Event | Victim |
Geodata | All items |
Given Assistance | Assistance |
Hours spent | Activity |
Needs | Victim |
Ordnance | Accident, Activity, Land |
Scenario
If you for example would like to:
- change an existing reference point to benchmark
- no changes to the polygon
- add one more ordnance
- correct Hours spent.
To be able to update as above you must make two Data Entry forms and retype a lot of information which takes time and increases the probability for data errors hence we strongly recommend to start form the Summary window instead and use the Update action when more than one field needs to be changed for an existing item. The Update action also provides a better overview of existing information than the Replace and Combine actions do.
Replace
If the above listed fields/subobjects are filled in on the current Data Entry Form the information will replace the existing information.
Examples of end result
If the existing item has 15 Unknown AP mines and the Data Entry form has 3 Unknown AP mines the end result with the action Replace is 3 Unknown AP mines.
If the existing item has one reference point and one polygon and the Data Entry form has only one benchmark the end result with the action Replace is only one benchmark.
Combine
If the above listed fields/subobjects are filled in on the current Data Entry Form the information will be aggregated/added to the existing information.
Examples of end result
If the existing item has 15 Unknown AP mines and the Data Entry form has 3 Unknown AP mines the end result with the action Combine is 18 Unknown AP mines.
If the existing item has one reference point and one polygon and the Data Entry form has one benchmark and one polygon the end result with the action Combine one reference point, one benchmark and two polygons.
|