Changes

Jump to: navigation, search

Shutdown IMSMA Server

129 bytes added, 11:22, 17 October 2017
no edit summary
It is recommended to shutdown the IMSMA server before a backup is taken or a Staging area is generated.
This command line may either # be added to the beginning of# the '''[[Scheduling Backup | IMSMA backup script/bat]]''' file or # the generate '''[[Scheduling the Staging Area creation | Staging area script/bat]]''' file '''OR''' # as a separate script/bat file that is scheduled to be executed before the above scripts.
<pre>
java -cp "C:\IMSMAng\server\jboss4\bin\shutdown.jar" org.jboss.Shutdown -S
</pre>
 
It is also possible to '''[[Start-up IMSMA Server | start-up the IMSMA Server]]''' with a bat-file.
{{NavBox Technical Notes}}
[[Category:NAA]]
6,632
edits

Navigation menu