Changes

Jump to: navigation, search

Reconcile

141 bytes removed, 11:30, 18 March 2019
no edit summary
=== New or existing item ===__NOEDITSECTION__
Before a data entry may start, both at data providers such as operators and at National Mine Action Authority, the first and very important task is to determine if the piece of information that is received on a paper or as maXML xml already exists in the database or not.
New information can be of two different types:
| New
|-
| [[Update the Data in the Summary Window | Update from Summary Window]]
| To update existing data
| Update
|-
| rowspan="4"| '''Other Reconcile Actions'''
| [[Reconcile by Linking to an Existing Item Record|Link to Existing Item]]
| Link may be used in combination which several of the other Actions
| Link
|-
| [[Reassign an Item Location | Reassign Item to another Location]]
| Special updating Action when to which Location an item is assigned
| Change Location
|-
| [[Remove a Link Between Items | Unlink Items]]
| Special updating Action when items need to be Unlinked
| Unlink
[[Image:Fig42.png|400px|center]]
{{Warning | When updating information the updating Data Entry Form's Date of information must be a later date than the Data Entry Form(s) that created the information since the calculation of the Summary item is based on Date of Information. If the date is earlier or the same, no change of the Summary items occurwill '''not''' be updated.}}
=== Links? ===__NOEDITSECTION__
{{NavBox HowTo Reconcile and Approve}}
[[Category:COONAA]]
6,632
edits

Navigation menu