Difference between revisions of "QM Artifact"

From IMSMA Wiki
Jump to: navigation, search
 
Line 1: Line 1:
 
{{New_6.0 |''Major Non-conformity'', ''Minor Non-conformity'' and ''Observation'' were added in 6.0.}}
 
{{New_6.0 |''Major Non-conformity'', ''Minor Non-conformity'' and ''Observation'' were added in 6.0.}}
 
{{Note | The table is called ''qa'' and the ''maXML element level3'' is called ''QAActivity''. }}
 
{{Note | The table is called ''qa'' and the ''maXML element level3'' is called ''QAActivity''. }}
 +
 +
[[Image:Qm xml.png|600px]]
  
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"

Latest revision as of 14:58, 24 July 2019

New 6.0.png Major Non-conformity, Minor Non-conformity and Observation were added in 6.0.
Note.jpg The table is called qa and the maXML element level3 is called QAActivity.

Qm xml.png

maXML element level4 maXML element level5 maXML element level6 maXML Type DIM Label IMSMA Enum Category
AdditionalInformation String Additional Info
AreaSize MeasuredValue Double Area Size
AreaSize UnitOfMeasure String
Association Association GUID String
Association Association OriginalID String
Association TargetInformation Name String
ClearanceDepth MeasuredValue Double Clearance Depth
ClearanceDepth UnitOfMeasure String
ClearedAreaSize MeasuredValue Double Cleared Area Size
ClearedAreaSize UnitOfMeasure String
CopyGoTo String Copy To
Geospatialinfo Geo GeospatialInfo
HourSpent Double Hours Spent
InspectorName String Inspector Name
MACRepresentativeName String Mac Rep Name
MACRepresentativePosition Date Mac Rep Position
MACRepresentativeSignedDate String Mac Rep Sign Date
MajorNonConformity String Major Non-conformity Yes No Answer
Marked String Marking Yes No Answer
MinorNonConformity String Minor Non-conformity Yes No Answer
Municipality String Municipality
Observation String Observation Yes No Answer
OriginalGoTo String Original To
QADate Date Date of Activity
QADuration ActualDuration EndDate DateTime End Date
QADuration PlannedDuration EndDate DateTime Planned End Date
QADuration PlannedDuration StartDate DateTime Planned Start Date
QADuration ActualDuration StartDate DateTime Start Date
QAIdentification GUID String
QAIdentification OriginalID String QM ID
QAMethod String Method Used QA Method
QAObjectType String Object Type ObjectType
QAOrganisation OrganisationID GUID String Organisation
QAOrganisation OrganisationID OriginalID String Organisation ID
QAOrganisation OrganisationName String Organisation Name
QAResults String Results
QAResultStatus String QM Result Status QAResultStatus
QAStatus String Status QAStatus
QualityAssuranceBy String Quality Assurance By
QualityControl ClearanceEquipmentInspected String Clearance Equipment Inspected ClearanceEquipmentInspected
QualityControl Documentation String Documentation Documentation
QualityControl FacilitiesInspected String Facilities Inspected FacilitiesInspected
QualityControl AcceptanceDate Date Acceptance Date
QualityControl ClearedAreaDescription String Clearance Area Description
QualityControl DeliveryDate Date Delivery Date
QualityControl OnsiteInspectionPurpose String Onsite Inspection Purpose
QualityControl OperationsSuspendedReason String Operations Suspended Reason
QualityControl SpecialMonitoringReason String Special Monitoring Reason
QualityControl SupportEquipmentInspected String Support Equipment Inspected SupportEquipmentInspected
QualityControl Worksite String Worksite Worksite
QualityControl AccreditedbyUNMAO String Accredited by UNMAO Yes No Answer
QualityControl AdequateSupervision String Adequate Supervision Yes No Answer
QualityControl CompliantWithNTSG String Compliant With NMAS / NTSG Yes No Answer
QualityControl CompliantWithOrgSOP String Compliant with Org SOP Yes No Answer
QualityControl DebriefAccepted String Debrief Accepted Yes No Answer
QualityControl DebriefProvided String Debrief Provided Yes No Answer
QualityControl EquipmentStoredProperly String Equipment Stored Properly Yes No Answer
QualityControl EquipmentSuitable String Equipment Suitable Yes No Answer
QualityControl EvidenceofTestingandEvaluation String Evidence of Testing And Evaluation Yes No Answer
QualityControl Facilities Suitable String Facilities Suitable Yes No Answer
QualityControl InternalLogsCurrent String Internal QM Logs Current Yes No Answer
QualityControl MaintenanceLogsCurrent String Maintenance Log Current Yes No Answer
QualityControl NonComplianceCorrected String Noncompliance Corrected Yes No Answer
QualityControl Operations Suspended String Operations Suspended Yes No Answer
QualityControl PersonnelQualified String Personnel Qualified Yes No Answer
QualityControl QualifiedMedicAvailable String Qualified Medic Available Yes No Answer
QualityControl SpecialMonitoring String Special Monitoring Yes No Answer
QualityControl VisitorLogsCurrent String Visitor Logs Current Yes No Answer
QualityControl WarningDelivered String Warning Delivered Yes No Answer
QualityControl WarningExplained String Warning Explained Yes No Answer
QualityControl WarningReceived String Warning Received Yes No Answer
ResponsibilityName String Responsible Authority
ResponsibilityOrganisation OrganisationID GUID String
ResponsibilityOrganisation OrganisationID OriginalID String
ResponsibilityOrganisation OrganisationName String Responsible Authority
ResponsibilitySignedDate Date Responsible Authority Sign Date
TaskDossier String Task Dossier
TypeOfActivity String Activity Type QAActivityType
UnclearedAreaDescription String Uncleared Area Description
UnclearedAreaSize UnitOfMeasure String
UnclearedAreaSize MeasuredValue Double Uncleared Area Size