The following figures show how each programme can tailor the system to support a specific hazard clearance/reduction workflow process for each type of hazard, from a traditional process for minefield clearance with multiple steps including a technical survey, clearance and completion survey to a simplified process for UXO clearance that includes only a clearance. Each example involves a single hazard on which one or more hazard reduction activities are conducted. At each step, information about the hazard’s status and type is updated as a result of the hazard reduction process.
In the figure below, a CHA is created and its status is set to ―Active"Active.‖ " A technical survey process is then conducted on the hazard which results in changing the subcategory of the hazard from "CHA" to "Minefield" and defining the hazard’s perimeter. Next, a clearance process is conducted on the minefield that results in updating the status of the hazard to "Worked On." Finally, a completion survey is submitted that updates the status of the hazard to "Closed."