526 bytes added,
18:19, 20 August 2016 It is recommended to shutdown the IMSMA server before a backup is taken or a Staging area is generated.
This command line may either
# be added to the '''[[Scheduling Backup | backup script/bat]]''' file or the generate '''[[Scheduling the Staging Area creation | Staging area script/bat]]''' file OR
# as a separate script/bat file that is scheduled to be executed before the above scripts.
<pre>
java -cp "C:\IMSMAng\server\jboss4\bin\shutdown.jar" org.jboss.Shutdown -S
</pre>
{{NavBox Technical Notes}}
[[Category:NAA]]