Changes

Implementation plan

777 bytes added, 23:08, 24 February 2014
no edit summary
* Uninstall ArcEngine 9.3.1, {{IMSMANG}} and IMSMA RE 5.08.04
* Install {{IMSMANG}} and IMSMA RE 6.0
* Restore dataset: at the NMAA and verify [[Upgrade from 5.08.04 to 6.0 process|Check with the countries]]: distribute backup to local installationsredo all configurations
* Refresher training for end-users
You’re not done until you can run reports and data sharing is working in * Plan the country!next activities 
==Full backup and configuration details==__NOEDITSECTION__
==Uninstall ArcEngine 9.3.1, {{IMSMANG}} and IMSMA RE 5.08.04==__NOEDITSECTION__
This needs to be done on '''all''' computers in the country during a short time period since all installations in the country needs to be on the same version. After uninstallation the IMSMANG and IMSMARE folders should be deleted, refer to '''[[Uninstall IMSMANG and related applications]]''' and [[Install and Uninstall IMSMA Remote Entry#Uninstalling IMSMA Remote Entry|'''Uninstalling IMSMA RE''']] for detailed instruction on how to uninstall. It is also good practice to restart the computer.
If the country is also upgrading to ArcGIS Desktop 10.1 they could uninstall older versions now too.
==Install {{IMSMANG}} and IMSMA RE 6.0==__NOEDITSECTION__
Refer to '''[[Install IMSMANG Version 6|Install install {{IMSMANG}} V6.0]]''' and [[yyInstall and Uninstall IMSMA Remote Entry#Installing IMSMA Remote Entry|'''installing IMSMA RE''']]. It is important that the ArcEngine license is registred before restoring the database. ==Restore dataset and redo all configurations==__NOEDITSECTION__The database should be restored the NMAA and verify [[Upgrade from 5.08.04 to 6.0 process|Check with the countries]]with the country. The client and server configuration might need to be adjusted. The NMAA needs to distribute the full backup to all local installationsand give country specific instructions e.g. local projection files. Verify that xxx ==Refresher training for end-users==__NOEDITSECTION__The NMAA needs to conduct refresher training for end-users. It is recommended to have different groups e.g. data entry personnel and management do not need the same training
6,632
edits