The Data Entry process consists of three major steps:
- Reconcile
- Data Entry
- Approve.
The major steps consist in their turn of several subtasks which may be carried out by one or more different persons and/or stakeholders in the Mine Action programme. For data quality purposes, it is important that the data is adequately checked. With multiple permission levels for the Approval workflow, different users can be assigned different permissions, allowing Mine Action Programmes to implement a data-entry workflow that distinguishes between data entry and data verification roles.
Reconcile |
|
Data Entry |
|
Approve |
|
Contents
Reconcile
Reconcile means "to make two sets of numbers add up to the same total" which with IMSMA terms is process of getting all different subsets of Mine Action information in a country (e.g. operators' clearance information) to a correct and coherent national database.
New or existing item
Before a data entry may start, both at data providers such as operators and at National Mine Action Authority, the first and very important task is to determine if the piece of information that is received on a paper or as maXML, does it already exist in the database or not?
New information are of two different types:
- information about a new item
- For example a Land or a Victim that is previously not reported/entered into IMSMANG. The Land might have been contaminated 10 years ago or the Victim injured 5 years ago but from our IMSMANG perspective it is new due to it is not in the database.
- new information about an existing item
- For example a polygon of an existing Land that previously did not have that recorded in the database or a correction of date of birth for an existing Victim.
The report that is received in both cases may not look any different so it is vital that the process of new information classification is thorough. Read more about Summary items and Data Entry Forms here.
It should be outlined in the Data Entry SOP whose responsibility it is to determine if it is a new item or updating information about an existing item. |
Select Data Entry Action
Summary window toolbar
Example of Reconciliation Tab Depending on which Action you choose the Reconciliation tab of the Data Entry Form will be populated different. The Actions in the From Summary window and Other Actions automatically populates the Reconciliation tab.
Select Data Entry Form templateNext decision is to choose which template to use for the Data Entry. It might be appropriate to have more than one Data Entry template for one item, e.g. one for the information about the Victim and another template for Victim Needs Assessment. The item Activity is an example where each process has their own template, i.e. Non-Technical Survey, Technical Survey, EOD Spot Task, Completion Report, Post-Clearance Survey, etc. Select Template for New Data Entry Form window Data EntryAn important part of the Data Entry is of cause the template itself and that is both collecting the data that is required and that the design of the template makes is easy to do Data Entry and give guidance that enhances/ensures high data quality such as required fields. Data Entry itselfFor more information on how to do data entry, see Use the Data Entry Form Editor Window. Links?Note: Connections to Country Structure and Location have been omitted from the example The last step of the Data Entry is to specify on the Reconciliation tab if the item should be linked to another item. In IMSMANG the links implicate a relationship between the items. For example:
ApproveApproval workflow / Data Entry Form Statuses SaveThe first step in the Approval workflow is done by the Data Entry staff and saves the Data Entry Form. It may now be found in the Workbench. Until a Data Entry Form is approved, it exists only in the Workbench and does not update any Summary items. The report can still be modified or deleted. Peer reviewThe next step in the Approval workflow is to have another person to review the contents of the Data Entry Form. SubmitWhen the Data Entry staff feels that the contents of the Data Entry Form has good enough data quality for the last review, they click on the button Submit and the status changes. The Data Entry Form is still in the Workbench. Final reviewIf the Data Verifier does not consider the content of the Data Entry Form to meet the Data Quality standard of the Mine Action programme e.g. a QM item should always be linked to an Activity then the Data Entry Form will be Rejected. Reject or Approve?If the Data Verifier is not satisfied then the Data Entry Form will be Rejected. When the Data Quality is good enough the Data Entry Form may be Approved. The Approval will trigger an update of an existing item (Summary) or creating of a new item depending of chosen Action.
|